Texas Silica Mining Project
Buyer/Referrer version:
Mine-PCSP.ProsperSystems.biz
Latest Prosper Systems Property: Property.ProsperSystems.biz
Once the Buyer/Collaborator Application (Abcrr.ProsperSystems.biz)
has been accepted,
then NCNDA is signed, Prosper Systems will issue detailed information on this
project.
Base Application for Properties: Aproject.ProsperSystems.biz
NOT to be posted on
websites, social networks or discussion groups –
introductory paragraph without Project Name, Location or Value may be allowed.
~~~~~~~~~~ CONFIDENTIAL
Information only for Collaborators ~~~~~~~~~~
Remove this boxed
information for Buyer/Referrer version
Collaborator version:
Mine-PCSP-C34.ProsperSystems.biz
Actual Project Name:
Potter County Silica Mine Project
Project Location:
USA; TX; Amarillo; 79124; 35.310993 N, 101.975527 W
Sales Collaborator Fee – shared among all Collaborators per CollaborationFee.ProsperSystems.biz per
transaction: 10% purchase price.
If JV/investor funded, fee is reduced to 5% + 3% Equity
Mgt Team Details: By request,
upon completion of the NCNDA
~~~~~~~~~~ Desensitized Buyer/Referrer Information
follows~~~~~~~~~~~
Price:
US $60 Million
Appraisal (estimated minimum): US $1.824 Billion; based on 54M tons at best
estimate of price of $35/ton and 96.5% average minimum grade
Terms
Options: Cash; Finance, 50% down, open APR, after 1st
year, up to 10 years
Project
Brief: The Silica Mine Project is extraordinary in
many ways. It has a strong management
team in place or committed, rich 54M-ton ore deposit, very economical,
non-chemical processing to produce annual net profits of $20M or more, located
only minutes of a major North Texas city, minimal permitting requirements,
ready-to-buy customers in TX and nearby states, and immediate access to rail,
road, power, water, telephone and a large labor force. It is a great money-making machine only
requiring implementation of well-designed plans.
Exit
Strategy: Sell, 2011; IPO or Sell to Large-Industry
Buyer, 2016
Current
EBITDA Profit: Not in Production Yet
Minimum
Projected EBITDA: US $20M, year 3
Ultimate
EBITDA: US $25M, by year 4; Adding $5M after full
production reached
Management
Team Experience
(Number, Total Experience): 5, 155; CEO
in place, the rest are identified; marketing man very experienced; about 35-50
labor force readily available
Operating
Company: Silica City Management, Houston TX
(management team available on request)
Property
Definition: 324 Acres; Ground Level
Year
Purchased: 2003
Location
Condition: Immediate, Good; Surrounding Area, Excellent; Region,
Excellent; Have good neighbors, not enough silica tonnage elsewhere to build
plant.
Permits:
Need all plans and specs ($150K) including mining safety. None secured at this point.
Mine
Documentation: Geologic Rpt, 2005; Assay Rpt, 1987-1993
Sales
Documentation: Project Summary, 2011-06-01
Additional
Information: Has a railroad spur bypass and county road
access, gas and high-tension lines within a mile, well and telephone on
property. Only need pad for building and
processing, as well as transportation equipment. Products:
fiber glass, glass, oil and gas fracking sand, and foundry sand for
smeltering. Have excellent team members,
using local off-the-shelf equipment to create production plant, and growing
market in this fine-grain silica sand.
Contact: Your Collaborator (Presenter, Broker,
Consultant, Referrer or Representative) or
Kenton Johnson <Kenton@ProsperSystems.biz>,
Founding Member, Prosper Systems LLC, Collaboration.ProsperSystems.biz,
USA (302)KentonJ.
Disclaimer: Collaborator(s) makes
no warranties or representations as to the quality of an opportunity, the
integrity of the Buyer, Seller or associated Collaborators, or the value of a
given transaction. Collaborator is
acting only as connection between Buyers, Sellers and their Collaborators. All due diligence is the responsibility of
Buyers and their Representatives.